Address: Guangzhou Zengcheng City, Eastern high-tech industrial park
Water Treatment: 40T/day
Beginning and ending time: 2008 to 2013
Process: pre-exposure conditioning tank + cooling tower + flocculation / precipitation + the anaerobic tank + MBR pool
The main operation of environmental protection equipment: to enhance pump, Roots blower, filter, dosing pump, MBR membrane processing device level automation control mode.
The station operator 12 hours a day, technicians and maintenance personnel at any time enthusiastic service, water indicators standards.
The liying Guangzhou Plastic Co., the sewage treatment station
XianKE | 2013-05-10 | Close


