Project Overview: the Shunneng garbage Power Co., Ltd. is a daily processing 700 tons of garbage incineration power plant, according to the relevant national policies and requirements and combined with the actual situation of the project, to deal with the sewage generated in the production process, the main sewage systemThe task is to deal with the leachate, after sewage treatment up to the national and local environmental emissions standards through the drainage system into the Xijiang River (East China Sea waterway).
Design: leachate treatment discharge standards.
Design size: 150 tons / day
Water quality standards: Guangdong Province, local standards for water pollutant discharge limits first period, (DB44/26-2001), an emission standard


