Project Overview: Nanhai environmentally friendly power plants based on the garbage as fuel for new power plants, capacity planning: 200 tons / day the X5 garbage incinerator, built in two phases, a project on the 200 ton / day incinerator,The site is located in the Shishan SHISHAN Woodland Shougouling. Power station buildings are mainly office buildings, the main workshop and ancillary structures. The fourth floor of the main workshop, the story of 23 meters, building area of 1000 square meters, integrated pumping station level, measuring a height of 6.55 meters, construction area of 260.78 square meters.
Design: garbage pit percolation vehicle washing, staff living water after treatment discharge standards.
Design size: 300 tons / day



